Sheppey’s north coast is moving inland
New funding will help the island prepare for coastal erosion, but what happens to the people whose homes we have decided not to defend?
Six years after a house collapsed over the cliffs at Eastchurch, Swale Borough Council is preparing to spend more than £840,000 helping Sheppey respond to coastal erosion. With much of the island's north coast earmarked for continued retreat, we look at the decisions behind that policy and what it means for the people whose homes stand in its way.
Sheppey’s north coast is moving inland
On a mundane Wednesday in May 2020, a fossil hunter noticed a crack in Surf Crescent at Eastchurch on the Isle of Sheppey. It ran underneath the corner of an aptly named house called Cliffhanger. Two days later, part of the road fell away. On Friday night, the fire service got the call. People from about 20 homes were taken to a community centre, and crews helped Swale’s building control officers inspect the properties nearest the edge. A second landslip on Sunday took part of Third Avenue and Cliffhanger's garage, leaving the house suspended over the drop. Technical rescue crews returned to make it safe for utility companies to shut off supplies.
By Tuesday morning, most of the house had come down.

Swale Borough Council wants to get a better look at the cliff before the next call-out. It set out a plan on Thursday that includes a drone and training to fly it, more surveys and a system to track movement along the coast in real time. The plan also includes funding for a specialist engineer and an officer to work with people living near the cliffs. Work could start in 2027 and run to March 2029 if the Environment Agency signs off on the plans and grant and Swale confirms its share.
Swale puts the cost at a little over £840,000, with up to £755,000 from the government and £89,000 from the borough. It’s one of 12 projects picked to share more than £11.2m in a round of government funding announced this week.
The engineers brought a drone to Eastchurch in the days after the collapse. Their report also looked back at how far the coast had moved over a century. Between the 1860s and the 1960s, different parts of the coast from Bugsby’s Hole to Warden Point receded at average rates of roughly one to two metres a year. Swale expects erosion to speed up with climate change. An annual average can only tell so much to a household with a few metres of garden left. The ground can give way in a single night.
There’s a Second World War radar station at Warden Point that was built to watch for ships in the Thames estuary and low-flying aircraft. Being high up was fairly important to the job. Its remains are now at the bottom of the cliff, along with fragments of a nearby concrete sound mirror built in the days when detecting an aircraft meant listening for one. Both came down as the coast eroded, according to Kent’s historic environment record.

Sheppey has several official answers to what should happen when the coast moves. At Minster, the intention is to keep the existing defences. The low-lying parts of Warden and Leysdown are meant to stay protected from flooding.
Along the cliffs from the end of Minster’s defences to Warden Bay, including Eastchurch Gap, the plan is to let the shoreline recede. The official phrase is ‘no active intervention’, and it applies as far as the shoreline plan goes, to 2105.